Air India A-320 VT-SCL · Serious incident: bird strike at Mumbai
AAIB India report title: Serious Incident to aircraft VT-SCL at Mumbai on 12.04.2013
Probable cause · AAIB India
After being handed over to tower, the flight crew did not communicate with the ATC on any of the frequencies and continued to land whereas it was instructed to go around by the tower due ongoing runway inspection. Fatigue on the part of flight crew contributed to the error. 4.
What happened
Government of India vide notification no. AV.15018/21/2013-DG ordered investigation of the serious incident to Airbus A-320 aircraft VT–SCL on 12/04/2013, belonging to M/s Air India by a Committee of Inquiry. The intimation of the serious incident was provided to ICAO and BEA France as per the requirements of ICAO Annexure 13. Prior to the landing of subject aircraft, two Jeeps were carrying out inspection of runway 09/27 as instructed by ATC due suspected bird strike. On seeing the subject aircraft at short finals, the jeeps vacated the runway of their own though by the same time ATC also instructed the jeeps to vacate the runway. The aircraft thereafter landed safely. The incident occurred in day light conditions. All the timings in the report are in IST (UTC + 5.30 hrs.) unless otherwise mentioned. The probable cause of the serious incident has been given as follows: After being handed over to tower, the flight crew did not communicate with the ATC on any of the frequencies and continued to land whereas it was instructed to go around by the tower due ongoing runway inspection. Fatigue on the part of flight crew contributed to the error. The Committee has also given the following safety recommendations to obviate such incidents in future: DGCA may develop a fatigue risk management policy under Safety Management System, wherein operators may be asked to: Implement proces
Findings
- 1. The aircraft was having valid Certificate of Registration and valid Certificate of Airworthiness. All mandatory modifications were carried out.
- 2. The Aircraft was serviceable and there was no snag reported during or after the flight.
- 3. The crew had not entered any snag in the post flight documents. There was no maintenance action pending prior to the take off.
- 4. The crew had valid licences with endorsements. They had valid medical Certificates and have undergone pre-flight medical check prior to take off from Mumbai.
- 5. The flight was operated as per the FDTL requirements in the CAR on the subject at that time. Adequate rest was also provided to the crew.
- 6. PM (commander) was authorized to impart supervised take off and landings to the PF (First Officer). The PF was carrying out flying under supervision and had undergone check for supervised take off and landings.
- 7. No adverse report of malfunction was received regarding any navigation aids including landing aid i.e. ILS RWY 27. ATM automation system and A-SMGCS were working normal.
- 8. Frequencies-Approach (DEP)-127.9 MHz, Approach (ARR)-119.3 MHz, Tower-118.1 MHz and SMC-121.9 MHz were working normal.
- 9. No adverse report was received regarding aerodrome, its facilities and condition of landing area at the time of incident.
- 10. The SMC controller was holding rating for Aerodrome Control Tower since 26/08/2011 and had attended Annual Refresher course on 19/03/2013.
- 11. The Tower controller was holding rating for Aerodrome Control Tower since 12/11/2011 and had attended Annual Refresher course on 19/03/2013.
- 12. The crew had operated two sector return flight (VABB- OMAA-VABB) with scheduled take off from Mumbai at 0000 hrs. and with final arrival in Mumbai at 0715 hrs. The flight covered whole period of window of circadian low.
Safety recommendations
- 1. DGCA may develop a fatigue risk management policy under Safety Management System, wherein operators may be asked to: Implement processes and procedures for evaluating information on fatigue-related incidents and evaluating their effects. Develop procedures for reporting, investigating, and recording incidents in which fatigue was a factor. Formalize education/awareness training programs.…
- 2. AAI may lay special emphasis on the RCF procedures when aircraft is on final approach track, during the refresher course.
- 3. Safety assessment of risk associated with runway inspection with two jeeps be carried out by the aerodrome operator in consultation with AAI.
Source reports
- Serious Incident to aircraft VT-SCL at Mumbai on 12.04.2013 (Final report)
Questions
What happened to VT-SCL on 12 April 2013?
Government of India vide notification no. AV.15018/21/2013-DG ordered investigation of the serious incident to Airbus A-320 aircraft VT–SCL on 12/04/2013, belonging to M/s Air India by a Committee of Inquiry. The intimation of the serious incident was provided to ICAO and BEA France as per the requirements of ICAO Annexure 13. Prior to the landing of subject aircraft, two Jeeps were carrying out inspection of runway 09/27 as instructed by ATC due suspected bird strike. On seeing the subject aircraft at short finals, the jeeps vacated the runway of their own though by the same time ATC also instructed the jeeps to vacate the runway. The aircraft thereafter landed safely. The incident…
What caused the serious incident involving VT-SCL?
According to the AAIB India report: After being handed over to tower, the flight crew did not communicate with the ATC on any of the frequencies and continued to land whereas it was instructed to go around by the tower due ongoing runway inspection. Fatigue on the part of flight crew contributed to the error. 4.
Who investigated the serious incident involving VT-SCL?
The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: final report.
What safety recommendations were made after the serious incident involving VT-SCL?
The report makes 3 safety recommendations. 1. DGCA may develop a fatigue risk management policy under Safety Management System, wherein operators may be asked to: Implement processes and procedures for evaluating information on fatigue-related incidents and evaluating their effects. Develop… 2. AAI may lay special emphasis on the RCF procedures when aircraft is on final approach track, during the refresher course. 3. Safety assessment of risk associated with runway inspection with two jeeps be carried out by the aerodrome operator in consultation with AAI.
Full case page: events, crew, weather, defence layers and page links