Debrief
Cases / VT-IEB / VT-SPJ
Date
2 September 2013
Registration
VT-IEB / VT-SPJ
Aircraft
B737-800
Operator
SpiceJet
Location
Delhi (VIDP)
Report
Report
Investigated by
AAIB India (Indian body)

VT-IEB / VT-SPJ · Serious incident: air proximity at Delhi

AAIB India report title: Serious Incident of air proximity between aircrafts (VT-SPJ) and IGO286 (VT-IEB) at Delhi on 02.09.2013

Probable cause · AAIB India

The Air Traffic Control made the initial error placing two aircraft in the conflict positioning and all opportunities that were available subsequently to block the progress of the error were not affected and the error was allowed to progress. The possibility of a machine related failure is ruled out and the Human Error attributable to different extent is seen manifested in all three work areas, ATC Tower and the Pilots in Both aircraft. Following are the considered extents of Human Errors in their respective stations : ATC Tower : 1.1 Decision to Hold an aircraft on active runway which is to delay its take off till the wake turbulence conditions subside and in this time allowing the other to continue its approach for same runway thereby reducing their lateral separations. 1.2 Inability to assess Conflict and thereby the risk in allowing the event to progress till the aircraft in approach executes the Go around from runway threshold point while the other is still occupying the runway and is about another 20 sec away in time before it rotated for take off un-sticking from the surface. 1.3 Inability in exercising Judgment and decision to order rejection of the take off by the aircraft on the runway, an omission that allowed the take off aircraft to conflict in the take off path with another that has gone around from the same runway. 1.4 No effective Air Traffic Control was exercised in the conflict situation with no transmissions to advise intruder traffic position or the instructions to resolve. The traffic conflict in this case are developed at altitudes in which the TCAS resolution advisories are kept inhibited and the Air Traffic Control has the major responsibility on conflict resolution. 1.5 Air Traffic Control further failed in allowing traffic to progress adversely following the 1st traffic conflict resolution and thereby allowing another conflict TCAS RA event. 1.6 Failure in exercising the effective Command Hierarchy system for situations where there are more then one controller on the station and are to handle Normal / Non Normal / Emergency situations. 1.7 Hand over / take over procedure implementation as in para 3.1 C above 1.9 In absence of any formal hand over / take over it is assumed that all three controllers named X,Y and Z are available on the channel. In emergency situation as in the present case the more experienced Controller (the instructor) should have contributed generating thereby the synergy in the system by effective resource management. Indigo VT IEB : 2.1 Recognizing that the aircraft in approach for same runway has just gone around discontinuing its approach, IEB should have rejected its take off and avoided thereby a traffic conflict situation in the take off path. VT-IEB was on runway at speed 82 knots when VT SPJ initiated the Go around and announced so. 2.2 The progress of the intruder traffic in such conflict situation was not adequately monitored either by TCAS display or by other available means. This led to Vt IEB crossing over through the level of the intruder traffic VT SPJ with very low lateral Separations. Spice Jet VT SPJ 3.1 Failure to Preempt a developing situation (aircraft at position about 6 nm to touch down progressing in approach to land at speed about 160 knots and another aircraft on runway is going to take approx 2 more minutes before it initiated the take off roll which further lasts another 45 seconds before the runway is available) 3.2 Aircraft continues its approach without the Landing Clearance and continues till the runway threshold, below the point marked as ‘Decision Height’ 3.3 Aircraft on its Go Around follows the expected Go around flight path till about 1600 feet radio height and then begins to descend for some time and climbs again. This maneuver is neither in compliance to Go around flight path or the commanded TCAS resolution advisories. 3.4 The progress of the intruder traffic in such conflict situation was not adequately monitored either by TCAS display or by other available means. This resulted in aircraft maneuvers which converged the conflicting traffic instead of separations. (It is however acknowledged that the maneuver of right banking the aircraft after visually sighting the intruder aircraft in close proximity only saved this serious situation from a possible mid air collision accident).

Safety recommendations

Source reports

Questions

What happened to VT-IEB / VT-SPJ on 2 September 2013?

VT-IEB / VT-SPJ · Serious incident: air proximity at Delhi. Source: AAIB India report "Serious Incident of air proximity between aircrafts (VT-SPJ) and IGO286 (VT-IEB) at Delhi on 02.09.2013".

What caused the serious incident involving VT-IEB / VT-SPJ?

According to the AAIB India report: The Air Traffic Control made the initial error placing two aircraft in the conflict positioning and all opportunities that were available subsequently to block the progress of the error were not affected and the error was allowed to progress. The possibility of a machine related failure is ruled out and the Human Error attributable to different extent is seen manifested in all three work areas, ATC Tower and the Pilots in Both aircraft. Following are the considered extents of Human Errors in their respective stations : ATC Tower : 1.1 Decision to Hold an aircraft on active runway which is to delay its take off till the wake turbulence conditions subside and in this time allowing the other to continue its approach for same runway thereby reducing their lateral separations. 1.2 Inability to assess Conflict and thereby the risk in allowing the event to progress till the aircraft in…

Who investigated the serious incident involving VT-IEB / VT-SPJ?

The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: report.

What safety recommendations were made after the serious incident involving VT-IEB / VT-SPJ?

The report makes 5 safety recommendations. 1. The Decision Height DH (or Decision Altitude, DA when applicable) by its definition is the specified height in approach by which a missed approach must be initiated if the required visual reference to continue the approach has not been established. This is… 2. A situation wherein more than one Air Traffic Controller is present on the active channel is possible under various scenarios such as the overlap period of handover-takeover situations or situations wherein double banking training or similar assignments… 3. This is observed that the laid down procedure on ATC Channel hand over / Takeover are not followed in practice and are deviated significantly from the Standard Procedures. The procedure implementations and thereby the Safety Management to this identified…

Full case page: events, crew, weather, defence layers and page links

Related cases