Debrief
Cases / VT-HGB
Date
29 September 2013
Registration
VT-HGB
Aircraft
Bell 212
Operator
United Helicharters
Location
Tukawade (Thane)
Report
Final report
Investigated by
AAIB India (Indian body)

United Helicharters Bell 212 VT-HGB · Accident: fatal / catastrophe at Tukawade (Thane)

AAIB India report title: Accident to helicopter VT-HGB at (Tukawade) Thane on 29.09.2013

Probable cause · AAIB India

The accident was caused due pilot continuing the flight in very poor visibility conditions with insufficient ground clearance and hitting the hill due to spatial disorientation. Non-functioning of the weather radar and non-familiarity of the pilot with the terrain along with lack of currency on the specific type contributed to the accident.

What happened

Governments of India vide notification no. AV.15013/5/2013-DG ordered investigation of the accident to Bell 212 helicopter VT–HGB belonging to M/s United Helicharters Pvt. Ltd. on 29/09/2013 by a Committee of Inquiry. The intimation of the accident was provided to ICAO, TSB Canada and NTSB USA as per the requirements of ICAO Annexure 13. The helicopter departed from Juhu airport for Aurangabad at 07:47 IST with 05 persons on board. The flight plan was filed to fly the route under VFR conditions at 2000 feet AGL with endurance of 02:30 hours. As per ATC, the helicopter changed over the frequency from Juhu to approach control at 05 NM. Juhu ATC passed the ETA 09:30 IST to the control tower. At 09:18 IST, Juhu ATC received call from FIC stating, VT-HGB is not in contact. Later WSO, Mumbai informed to Juhu ATC that the helicopter had crashed near Murbad and the same information was passed to Operator at 1010 hrs. IST. At the same time, message was received that the helicopter crashed at 0820 hrs. IST. The location of accident was at around 49 NM from Juhu airport and 104 NM prior to Aurangabad. The initial contact was made with the trees probably by the main Rotor Blades after which the Tail-Boom broke away on impact with a tree and later the cockpit got smashed after hitting with the ground. Engine along with MGB and Main Rotor Blades were found 20m further ahead of cockpit. The E

Findings

Safety recommendations

Source reports

Questions

What happened to VT-HGB on 29 September 2013?

Governments of India vide notification no. AV.15013/5/2013-DG ordered investigation of the accident to Bell 212 helicopter VT–HGB belonging to M/s United Helicharters Pvt. Ltd. on 29/09/2013 by a Committee of Inquiry. The intimation of the accident was provided to ICAO, TSB Canada and NTSB USA as per the requirements of ICAO Annexure 13. The helicopter departed from Juhu airport for Aurangabad at 07:47 IST with 05 persons on board. The flight plan was filed to fly the route under VFR conditions at 2000 feet AGL with endurance of 02:30 hours. As per ATC, the helicopter changed over the frequency from Juhu to approach control at 05 NM. Juhu ATC passed the ETA 09:30 IST to the control tower.…

What caused the accident involving VT-HGB?

According to the AAIB India report: The accident was caused due pilot continuing the flight in very poor visibility conditions with insufficient ground clearance and hitting the hill due to spatial disorientation. Non-functioning of the weather radar and non-familiarity of the pilot with the terrain along with lack of currency on the specific type contributed to the accident.

Who investigated the accident involving VT-HGB?

The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: final report.

What safety recommendations were made after the accident involving VT-HGB?

The report makes 7 safety recommendations. 1. DGCA may carry out regulatory audit of the Operator. 2. DGCA may issue instructions that all the Non Scheduled Operators should have a flying (current) professional atleast at one of the key post(s) to have a better control on operations from safety point of view. 3. DGCA may consider grouping Bell 212 and Bell 412 as two different models for training/ currency. In such cases DGCA may also specify the minimum currency on each model including Proficiency Checks to enable aircrew to fly both models simultaneously.

Full case page: events, crew, weather, defence layers and page links

Related cases