- Date
- 2 October 2013
- Registration
- VT-GOK
- Aircraft
- A 320
- Operator
- Indian Air Force
- Location
- Delhi (VIDP)
- Report
- Final report
- Investigated by
- AAIB India (Indian body)
Indian Air Force A 320 VT-GOK · Serious incident: runway incursion at Delhi
AAIB India report title: Serious Incident of runway incursion between VT-GOK 336 and Indian Air Force flight VUDBL at Delhi on 02.10.2013
Findings
- 1. Delhi Airport faced the congestions and delays for the scheduled departures for aircraft departing for apron 1 on account of VVIP movement which restricted the movements for some time.
- 2. After the departure of the VVIP aircraft and with a view to decongest the pending traffic simultaneous operation or all three Rwy was resorted to and in this process Rwy 09 which was previously used for aircraft taxi was made operational.
- 3. Rwy 09 control prior to its activation was with SMC (N) controller and when activated the control is shifted to the TWR controller.
- 4. At this moment when such transition of the Rwy is being implemented there is heavy density traffic and procedures are to be executed expeditiously. The arguments and some undesired transmissions are also reported which over loaded the frequency. It is also noted that a conflict between two aircraft SEJ 869 and another aircraft SEJ 2384 was being resolved by the SMC(N) controller at this point…
- 5. The SMC (N) controller cleared VU-DBL till holding point E2 and on acknowledging aircraft at this position VU-DBL was further cleared to cross Rwy 09.
- 6. The fact that in this span of time Rwy 09 control was handed over to the TWR controller and the situation supplemented by the involved work load in such heavy density traffic situation, this created the scope for an error to progress.
- 7. Rwy 09 active status was not updated on the ATIS broad cast and also not communicated to VU-DBL. The situational awareness for the crew of VU-DBL was therefore impaired.
- 8. It is suggestive from the available information that after obtaining the clearance from SMC (N) controller to cross Rwy 09 VU-DBL was not monitoring SMC (N) frequency 121.75 and were also not keeping a listening watch on the TWR frequency 118.75 MHz. The visual scan of the Rwy in both directions before crossing the same was reportedly conducted by VU-DBL but they failed to identify any…
- 9. SMC(N) controller acknowledges in his written submission to the committee that in the work pressure situation it was an oversight on his part in allowing a taxing aircraft to cross a Rwy which has just been activated for operation.
- 10. The situation was reconciled immediately and efforts were initiated to correct the progress of error before that was manifested. In this process the fact that VU-DBL did not monitor the SMC (N) frequency further compounded the situation. Further effort in cancelling the departure for VT-GOK on its take off roll broke the error chain and hence a possible accident avoided.
Safety recommendations
- . In the busy environment like of Delhi airport the simultaneous multi Rwy operation and also the changeovers of the Rwys is a likely and anticipated phenomenon. The air traffic control must review the procedures to preclude the chances of a human error in such situation. The processes as in practice as of now need a review.
- . Visual Alert could be created and activated around RWY 09/27 in the ASMGCS when it is active. Any aircraft entering in this area may be shown by enlarged datablock. This will give visual indication to both Tower and SMC Controller. Such effective filters may be inserted in the followed processes to check the progress of error.
- . The infrastructural support that is necessarily for safe and efficient conduct on such work intensive platform should be ensured. The man power allocation and the availability may be reviewed,
- . VU-DBL did not maintain a two way positive communication while in control with the surface movement controller. An RT blackout for this short duration may contribute seriously to an error chain. IAF may like to review the procedures in practice generically or any deviation from their SOP as observed in the subject incident.
- Efforts may be initiated by all stakeholders to ensure RT discipline for safe aircraft operation. Airports Authority of India may initiate suitable action in this regard.
Source reports
- Serious Incident of runway incursion between VT-GOK 336 and Indian Air Force flight VUDBL at Delhi on 02.10.2013 (Final report)
Questions
What happened to VT-GOK on 2 October 2013?
Indian Air Force A 320 VT-GOK · Serious incident: runway incursion at Delhi. Source: AAIB India report "Serious Incident of runway incursion between VT-GOK 336 and Indian Air Force flight VUDBL at Delhi on 02.10.2013".
Who investigated the serious incident involving VT-GOK?
The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: final report.
What safety recommendations were made after the serious incident involving VT-GOK?
The report makes 5 safety recommendations. . In the busy environment like of Delhi airport the simultaneous multi Rwy operation and also the changeovers of the Rwys is a likely and anticipated phenomenon. The air traffic control must review the procedures to preclude the chances of a human error in… . Visual Alert could be created and activated around RWY 09/27 in the ASMGCS when it is active. Any aircraft entering in this area may be shown by enlarged datablock. This will give visual indication to both Tower and SMC Controller. Such effective filters… . The infrastructural support that is necessarily for safe and efficient conduct on such work intensive platform should be ensured. The man power allocation and the availability may be reviewed,
Full case page: events, crew, weather, defence layers and page links