- Date
- 30 August 2016
- Registration
- VT-JEK
- Aircraft
- B777-300
- Operator
- Jet Airways
- Location
- London Heathrow Airport
- Report
- Final report
- Investigated by
- AAIB India (Indian body)
Jet Airways B777-300 VT-JEK · Serious incident: serious incident at London Heathrow Airport
AAIB India report title: Serious Incident to aircraft VT-JEK at London Heathrow Airport on 30.08.2016
Probable cause · AAIB India
Wrong selection of aircraft take- off performance by the Commander despite the Co-pilot selecting the right take-off performance initially but the commander overruled her take-off performance selection.
What happened
On 30th August 2016, M/s Jet Airways aircraft B777-300 registration VT-JEK departed from runway 27L of London Heathrow airport at 20:30 UTC. The aircraft departed from an intersection departure S4E and did not use the full length for take-off which could have been used from the north of the aerodrome after crossing the runway 27L. As per the initial report received from Air Accidents Investigation Branch (AAIB), U.K, the aircraft crossed the airfield boundary at approximately 13 feet AGL and an adjacent road at 30 feet AGL. This event has been treated as Serious Incident by AAIB, UK and handed over to AAIB, India for further investigations. Ministry of Civil Aviation constituted a committee of inquiry vide Notification No. Av- 15013/16/2016-DG to investigate the cause of the Serious Incident under Rule 11 (1) of Aircraft (Investigation of Accidents and Incidents), Rules 2012 comprising of Dr. Jitender Loura Assistant Director of Operations (AAIB) as Chairman and Shri Raje Bhatnagar, Assistant Director of Airworthiness (AAIB) as member.
Findings
- 1. The medical of both the cockpit crew members of Jet Airways, JAI117 was valid. The crew of Jet Airways JAI117 has undergone pre-flight medical checks including BA test which was negative.
- 2. At 2010 hrs the co-pilot contacted Heathrow Delivery stating that she had ATIS Information N. ATIS N stated that SB3 was closed but S4 was available for departure. 24 | P a g e After receiving the flight’s departure clearance, she was asked “DO YOU REQUIRE THE FULL LENGTH OF THE RUNWAY FOR DEPARTURE?” The co-pilot replied “NEGATIVE, SIERRA FOUR ACCEPTABLE” and was told to expect a “SIERRA FOUR…
- 3. VT-JEK took off from runway intersection S4, as briefed by the crew, but used performance figures calculated for intersection N1 (Runway 27L full length). Consequently, regulatory takeoff performance requirements were compromised.
- 4. Heathrow ATC correctly verified that the pilot of subject aircraft could accept an intersection departure, and that position was mentioned a total of 7 times by ATC and correctly read back by the pilot on each occasion.
- 5. Sufficient information had been published by the Aerodrome Authority on the non- availability of full-length departures from the southern holding points for Runway 27L.
- 6. For an all-engine go takeoff, at the event conditions, the estimated required field length would be 9387 feet with distance to liftoff at 8222 feet. The Airplane Flight Manual (AFM) distance to V1 was 6578 feet. If a RTO was initiated at V1, there would be 2809 feet of runway available for stopping.
- 7. For a balanced V1, one engine inoperable (OEI), the required field length would be 10,989 feet at the event conditions. The AFM distances to V1 was 6634 feet and to liftoff was 9020 feet. The climb performance with an engine inoperative is 2.4%.
- 8. After reviewing the ATIS, the Departure Briefing SOP required the crew to read out ‘Takeoff Data inputs’ before entering those data into the OPT, but the procedure did not specify which ‘Takeoff Data inputs’ were required and there was no requirement to nominate the runway or intersection to be used. The SOP following receipt of the load sheet ensured that the OPT based its takeoff performance…
- 9. The commander calculated aircraft takeoff performance from the first four intersections of Runway 27L (using the default OPT output corresponding to the full length), whereas the co-pilot calculated performance (correctly) for a takeoff from intersection S4W. Even though there was no requirement to read aloud the runway and intersection used by the OPT for the performance calculation, the…
- 10. It is the responsibility of the pilot to determine the suitability of an intersection departure for their aircraft and none of the subject Pilots have ever departed from SW4 intersection departure before the day of the serious incident.
- 11. The available evidence suggests that the departing aircraft completed a late rotation which, in comparison with previous departures of similar aircraft types, placed it at a significantly lower height as it left the airfield.
- 12. The aircraft manufacturer carried out an analysis of the takeoff using data from the aircraft’s Quick Access Recorder (QAR) and the environmental conditions used by the crew for the performance calculation.
Safety recommendations
- I. M/s Jet Airways (India) Limited to amend its Standard Operating Procedure for “Departure Briefing” to specify the takeoff data to be input into the Electronic F light Bag On-board Performance Tool.
- 2. M/s Jet Airways (India) Limited to amend its Standard Operating Procedure for “On receipt of Load and Trim sheet” to ensure that: a) Before the performance calculation is made, data entered into the Electronic Flight Bag On-board Performance Tool is valid and appropriate to the current circumstances, b) The runway and intersection used for the performance calculation, and the power Setting…
- 3. M/s Jet Airways (India) Limited to require its crews to call out and resolve discrepancies identified between the output of the commander and co-pilot’s Electronic Flight Bag On- board Performance Too! before entering data into the Control and Display Unit.
- 4. The crew shall be imparted corrective training on CRM, simulator similar exercise besides theory classes for the intersection takeoff.
- 5. All the crews of M/s Jet Airways and other Indian airlines shall undergo one simulator exercise of this sort during next simulator training.
Source reports
Questions
What happened to VT-JEK on 30 August 2016?
On 30th August 2016, M/s Jet Airways aircraft B777-300 registration VT-JEK departed from runway 27L of London Heathrow airport at 20:30 UTC. The aircraft departed from an intersection departure S4E and did not use the full length for take-off which could have been used from the north of the aerodrome after crossing the runway 27L. As per the initial report received from Air Accidents Investigation Branch (AAIB), U.K, the aircraft crossed the airfield boundary at approximately 13 feet AGL and an adjacent road at 30 feet AGL. This event has been treated as Serious Incident by AAIB, UK and handed over to AAIB, India for further investigations. Ministry of Civil Aviation constituted a committee…
What caused the serious incident involving VT-JEK?
According to the AAIB India report: Wrong selection of aircraft take- off performance by the Commander despite the Co-pilot selecting the right take-off performance initially but the commander overruled her take-off performance selection.
Who investigated the serious incident involving VT-JEK?
The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: final report.
What safety recommendations were made after the serious incident involving VT-JEK?
The report makes 5 safety recommendations. I. M/s Jet Airways (India) Limited to amend its Standard Operating Procedure for “Departure Briefing” to specify the takeoff data to be input into the Electronic F light Bag On-board Performance Tool. 2. M/s Jet Airways (India) Limited to amend its Standard Operating Procedure for “On receipt of Load and Trim sheet” to ensure that: a) Before the performance calculation is made, data entered into the Electronic Flight Bag On-board Performance Tool is valid… 3. M/s Jet Airways (India) Limited to require its crews to call out and resolve discrepancies identified between the output of the commander and co-pilot’s Electronic Flight Bag On- board Performance Too! before entering data into the Control and Display Unit.
Full case page: events, crew, weather, defence layers and page links