- Date
- 22 December 2019
- Registration
- VT-WJE
- Aircraft
- Airbus A320
- Operator
- Go Air
- Location
- Mumbai Airport (VABB)
- Report
- Final report
- Investigated by
- AAIB India (Indian body)
Go Air Airbus A320 VT-WJE · Serious incident at Mumbai Airport
AAIB India report title: Sserious Incident to aircraft VT-WJE at Mumbai Airport on 22.12.2019
Probable cause · AAIB India
The incident was caused by failure of LPT 3rd stage blades in flight as the blade material lacked crack growth resistance and damage tolerance to withstand any impact from material that may have liberated upstream.
What happened
On 22nd December 2019, Airbus A320 aircraft VT-WJEoperated by M/s Go Air carried out an air turn back due to high engine vibration while operating a scheduled flight from Mumbai to Chandigarh. Aircraft landed safely at Mumbai. The aircraft was under the command of an ATPL holder who was Pilot Flying (PF) with a co-pilot a CPL holder who was Pilot Monitoring (PM). There were 172 passengerson board the aircraft with 06 crew members. The aircraft took-off from Mumbai airport and while climbing passing FL210, “Engine stall” and “High Engine Vibration” ECAM warning message triggered for Engine # 1. The crew carried out the ECAM and QRH procedures. Due to engine vibration and fluctuating parameters, the crew decided to return to Mumbai and landed safely in Mumbai at 1250 UTC. On visual inspection of rear side of the engine almost all Low-Pressure Turbine (LPT) blades were found burnt and broken from the tip. The occurrence was classified as a Serious Incident by AAIB and Sh. Jasbir Singh Larhga, Deputy Director, AAIB was appointed as Investigator – In – Charge along with Sh Amit Kumar, Safety Investigation Officer as Investigator to investigate into the probable cause(s) of the serious incident, vide Order No. INV.12011/25/2019-AAIB dated 23rd December 2019 under Rule 11 (1) of Aircraft (Investigation of Accidents and Incidents), Rules 2017.
Findings
- 1. The aircraft had valid Certificate of Airworthiness, Certificate of Registration and the Certificate of Flight Release before operating the incident flight.
- 2. Both pilots were appropriately qualified to operate the flight.
- 3. There was no fire and no injury to any occupant on board the aircraft.
- 4. During post flight inspection, while carrying out visual inspection of the involved engine, i.e., inlet area and exhaust area of engine # 1, Low Pressure Turbine 3rd stage blades were found damaged.
- 5. The incident was similar to series of other events where LPT 3rd stage blades failed during operation. The failure was considered to be a known issue by the OEM andno Technical Investigation was carried out by the OEM.
- 6. Pratt & Whitney has issued SB 72-00-0111 to Introduce of a new LPT 3rd stage blade made of a different material which is more resistant to impact damage. The airline has subsequently incorporated the said SB in all its affected aircraft.
Source reports
Questions
What happened to VT-WJE on 22 December 2019?
On 22nd December 2019, Airbus A320 aircraft VT-WJEoperated by M/s Go Air carried out an air turn back due to high engine vibration while operating a scheduled flight from Mumbai to Chandigarh. Aircraft landed safely at Mumbai. The aircraft was under the command of an ATPL holder who was Pilot Flying (PF) with a co-pilot a CPL holder who was Pilot Monitoring (PM). There were 172 passengerson board the aircraft with 06 crew members. The aircraft took-off from Mumbai airport and while climbing passing FL210, “Engine stall” and “High Engine Vibration” ECAM warning message triggered for Engine # 1. The crew carried out the ECAM and QRH procedures. Due to engine vibration and fluctuating…
What caused the serious incident involving VT-WJE?
According to the AAIB India report: The incident was caused by failure of LPT 3rd stage blades in flight as the blade material lacked crack growth resistance and damage tolerance to withstand any impact from material that may have liberated upstream.
Who investigated the serious incident involving VT-WJE?
The Aircraft Accident Investigation Bureau (AAIB), India. The final report was signed 739 days after the occurrence, on 30 December 2021. Latest report: final report.
Full case page: events, crew, weather, defence layers and page links