Debrief
Cases / VT-SZK
Date
20 January 2020
Registration
VT-SZK
Aircraft
B737-800
Operator
—
Location
Hyderabad (VOHS)
Report
Final report
Investigated by
AAIB India (Indian body)

B737-800 VT-SZK · Serious incident: landing on closed runway at Hyderabad

AAIB India report title: Serious Incident to aircraft VT-SZK at Hyderabad on 20.01.2020

Probable cause · AAIB India

The aircraft ianded on ciosed Runway O9R because of the foiiowing: - e Pre conceived incorrect belief in the mind of flight crew that runway 09R will be available to them at destination due to the closeness with scheduled arrival time and NOTAM closer time. » Flight crew engrossed in an additional manoeuvre during final approach and not giving due attention to the DATIS broadcasting. e Due to confirmation bias, despite the landing clearance given for O9L by the ATC and flight crew correctly reading back the same, the flight crew manoeuvred the aircraft and changed track for landing on Runway O9R. e Absence of men/material/ vehicle on the runway O9R further strengthened the confirmation bias in the mind of flight crew. e {lluminated cross marker was not available on the runway. e Pilot Monitoring remaining a mute spectator and not correcting the PIC when runway O9R. was identified.

What happened

A Serious Incident of landing on closed runway occurred at Hyderabad on 20/01/2020. A scheduled flight from Mumbai to Hyderabad was given a vectoring to land on Runway 09L and establish FAT (Final Approach Track). The aircraft was high on approach, so controller gave vectoring to adjust the rate of descent as requested by the flight crew. During vectoring, the radar controller again cleared the flight for VOR approach RWY 09L. This was read back correctly by the flight crew. Once the flight was established on FAT, it was handed over to Tower. After the aircraft came in contact with Tower controller, he gave landing clearance for Runway 09L. This instruction was also read back correctly by the flight crew. Till VOR (Hyderabad VOR), the flight was approaching for Runway 09L but on reaching overhead VOR, the aircraft started manoeuvring to right for runway 09R and landed on Closed runway 09R. A NOTAM of runway 09R closure was applicable at that time. At the time of landing on closed runway, leader jeep was on runway for inspection purposes. This occurrence was classified in the category of serious incident and investigation was ordered to be carried out by Shri. R.S. Passi, Director as Investigator-in-charge and Ms. Kunj Lata, Assistant Director as Investigator. Page 2 of 27 FINAL INVESTIGATION REPORT ON SERIOUS INCIDENT TO B737-800 AIRCRAFT VTSZK AT HYDERABAD ON 20/01/2020 1. Air

Findings

Safety recommendations

Source reports

Questions

What happened to VT-SZK on 20 January 2020?

A Serious Incident of landing on closed runway occurred at Hyderabad on 20/01/2020. A scheduled flight from Mumbai to Hyderabad was given a vectoring to land on Runway 09L and establish FAT (Final Approach Track). The aircraft was high on approach, so controller gave vectoring to adjust the rate of descent as requested by the flight crew. During vectoring, the radar controller again cleared the flight for VOR approach RWY 09L. This was read back correctly by the flight crew. Once the flight was established on FAT, it was handed over to Tower. After the aircraft came in contact with Tower controller, he gave landing clearance for Runway 09L. This instruction was also read back correctly by…

What caused the serious incident involving VT-SZK?

According to the AAIB India report: The aircraft ianded on ciosed Runway O9R because of the foiiowing: - e Pre conceived incorrect belief in the mind of flight crew that runway 09R will be available to them at destination due to the closeness with scheduled arrival time and NOTAM closer time. » Flight crew engrossed in an additional manoeuvre during final approach and not giving due attention to the DATIS broadcasting. e Due to confirmation bias, despite the landing clearance given for O9L by the ATC and flight crew correctly reading back the same, the flight crew manoeuvred the aircraft and changed track for landing on Runway O9R. e Absence of men/material/ vehicle on the runway O9R further strengthened the confirmation bias in the mind of flight crew. e {lluminated cross marker was not available on the runway. e Pilot Monitoring remaining a mute spectator and not correcting the PIC when runway O9R. was identified.

Who investigated the serious incident involving VT-SZK?

The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: final report.

What safety recommendations were made after the serious incident involving VT-SZK?

The report makes 4 safety recommendations. 1. Hyderabad International Airport Limited (HIAL) should ensure that the _cross marker is placed on the runway as per the requirements. 2. ATC Hyderabad should add a conspicuous caution in DATIS for the runway in use as mitigation to the risk of aircraft landing on closed runway at Hyderabad. 3. Spice Jet should, as a part of CRM training, emphasise the role of pilot monitoring during landing including correct identification of runway.

Full case page: events, crew, weather, defence layers and page links