DoA B200GT VT-MPQ · Accident at Gwalior Airport
AAIB India report title: Accident to aircraft VT-MPQ at Gwalior Airport on 06.05.2021
Probable cause · AAIB India
1) The PIC (PF) carrying out a visual approach at night and knowingly deviated below the visual approach path profile (3 degrees) while disregarding the PAPI indications, thereby the aircraft collided with the raised Arrester Barrier. 2) Lack of Assertiveness on the part of the Co-pilot (PM). 3.3
What happened
Beechcraft Super King Air B200GT aircraft, VT-MPQ belonging to the Directorate of Aviation, Government of Madhya Pradesh (DoA,GoMP) was involved in an accident on 06.05.2021 while operating a flight from Indore Airport to Gwalior. The flight was under the command of an ATPL holder with another CPL holder as Co-Pilot. There was one passenger on board in addition. The flight crew contacted ATC Indore for clearance to operate the flight to Gwalior. The aircraft was cleared for Gwalior via airway W10N and FL270. Aircraft departed from RWY25 at Indore and climbed to FL 270. Aircraft descended into Gwalior in coordination with Delhi and Gwalior. Approaching Gwalior the crew were advised by the ATC that RWY24L was in use. ATC then asked the crew if they would like to carry out a VOR approach for the opposite RWY 06R. The crew requested for a visual approach for RWY 06R in the night time and were cleared to descend 2700 ft and called field in sight at 25 NM. Crew then requested for right base RWY 06R and were cleared to circuit altitude. Crew called turning right base with field visual and were cleared to land which the crew acknowledged. Just before landing the aircraft and short of the threshold, the main gear collided with the raised arrester barrier and came to a halt on the Runway 06R just beyond the threshold markings at 1515 UTC. The aircraft was substantially damaged, however t
Findings
- SR NO. DATE AREA OF SURVEILLANCE AIR SAFETY 1 FEB 2019 SMS SMS manual not approved and no SMS is established 2 JAN2020 SMS SMS is not yet implemented in the Organization 3 FEB 2019 PFME Control test for the BA equipment’s found not done on a daily basis 4 FEB 2019 PFME On 03.09.2018 BA test performed with equipment which was out of calibration and owned by the Organization 5 FEB 2019 DFDR Quantum…
- a) Recent amendments w.r.t Aircraft rules 2018 and CAR Section 5 Series C Part I, needs to be incorporated.
- b) No Checklists (incorporated as annexures) found included in the manual.
- c) Exceedance values of parameters not incorporated under FOQA 8 FEB 2019 FSS & FSDS On 04.02.2018, VT-MPR, Kurmi-Bhopal, with Hon. CM of MP on board and had suffered from excessive vibrations during flight. However, it was found that the same was not reported to DGCA. 9 FEB 2019 FSS & FSDS Load and trim sheets for rotorcraft are prepared by using software which is not approved by DGCA. 10 FEB…
- 1. The accountable manager/chief pilot is PMU for last three years, he continues to occupy a flying vacancy while not being fit to fly. Other than him, only two pilots are available for flying the SKA B200 which is inadequate.
- 2. The department has sanctioned posts (for more than one year) of operations manager, flight dispatcher and flight safety officer, the posts are lying vacant for more than one year and adversely affecting operations. 27 MAR 2019 Operator does not have a flight following procedure and is not hiring approved manpower for the same. This is a repeat observation requiring immediate action in the…
- 3.1.1 DoA,GoMP ● VT-MPQ was certified by the DGCA in the Normal Category Sub-Division Passenger Aircraft and was authorised to carry Passengers Only in the cabin and NOT Cargo as per their approved AOP. However, the aircraft was carrying Cargo in the Passenger compartment. ● DoA,GoMP did not seek an exemption from DGCA to operate a flight to carry Cargo in the passenger compartment in conformance…
Safety recommendations
- 4.1 DoA, GoMP i. DoA, GoMP may ensure compliance with DGCA requirements at all times and, for any deviation / exemption from the requirements, a specific DGCA permission must be obtained as per the laid down guidelines. ii. DoA GoMP/ other State Govt operators should ensure that all flight crew undergo recurrent simulator training as per the laid down norms of the DGCA. iii. The Flight Safety…
- 4.2 Indian Air Force i. IAF authorities may consider a video recording of all take-offs and landings of civil aircraft as laid down in the DGCA Air Safety Circular as carried out for IAF operations. ii. IAF authorities may consider video recording the ARFF (Search and Rescue) activities post an accident as per DGCA Air Safety Circulars. iii. IAF authorities may consider implementing an…
- 4.3 DGCA i. DGCA may advise all State Governments operating fixed wing aircraft / helicopters to prepare an SOP as per AIC 7 of 2021 (revised to AIC 11 of 2021, dated 9th July 2021) for carriage of Cargo in passenger compartment at the earliest. ii. DGCA may consider including a provision in AIC 7 of 2021 (revised to AIC 11 of 2021, dated 9th July 2021) the Emergency use of the State Government…
- 1. During the “Night” time, flight crew should preferably carry out an “Instrument approach” preferring the ILS and if ILS is not available a non-precision (CDFA) approach should be carried out. Visual approach should be given the last preference (except while conducting training flights to build proficiency in visual approach).
- 2. During night time in case the flight crew chooses to carry out a visual approach, then the approach should be carried out after coming overhead.
- 3. Flight crew should utilize all available landing aids (like ILS, Non-Precision approach profile) to support the approach or follow the guidance of PAPI/ VASI till crossing the runway threshold.
Source reports
- Accident to aircraft VT-MPQ at Gwalior Airport on 06.05.2021 (Final report)
Questions
What happened to VT-MPQ on 6 May 2021?
Beechcraft Super King Air B200GT aircraft, VT-MPQ belonging to the Directorate of Aviation, Government of Madhya Pradesh (DoA,GoMP) was involved in an accident on 06.05.2021 while operating a flight from Indore Airport to Gwalior. The flight was under the command of an ATPL holder with another CPL holder as Co-Pilot. There was one passenger on board in addition. The flight crew contacted ATC Indore for clearance to operate the flight to Gwalior. The aircraft was cleared for Gwalior via airway W10N and FL270. Aircraft departed from RWY25 at Indore and climbed to FL 270. Aircraft descended into Gwalior in coordination with Delhi and Gwalior. Approaching Gwalior the crew were advised by the…
What caused the accident involving VT-MPQ?
According to the AAIB India report: 1) The PIC (PF) carrying out a visual approach at night and knowingly deviated below the visual approach path profile (3 degrees) while disregarding the PAPI indications, thereby the aircraft collided with the raised Arrester Barrier. 2) Lack of Assertiveness on the part of the Co-pilot (PM). 3.3
Who investigated the accident involving VT-MPQ?
The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: final report.
What safety recommendations were made after the accident involving VT-MPQ?
The report makes 6 safety recommendations. 4.1 DoA, GoMP i. DoA, GoMP may ensure compliance with DGCA requirements at all times and, for any deviation / exemption from the requirements, a specific DGCA permission must be obtained as per the laid down guidelines. ii. DoA GoMP/ other State Govt… 4.2 Indian Air Force i. IAF authorities may consider a video recording of all take-offs and landings of civil aircraft as laid down in the DGCA Air Safety Circular as carried out for IAF operations. ii. IAF authorities may consider video recording the ARFF… 4.3 DGCA i. DGCA may advise all State Governments operating fixed wing aircraft / helicopters to prepare an SOP as per AIC 7 of 2021 (revised to AIC 11 of 2021, dated 9th July 2021) for carriage of Cargo in passenger compartment at the earliest. ii. DGCA may…
Full case page: events, crew, weather, defence layers and page links