- Date
- 5 February 2023
- Registration
- VT-ISE
- Aircraft
- A320
- Operator
- Inter Globe Aviation
- Location
- —
- Report
- Final report
- Investigated by
- AAIB India (Indian body)
Inter Globe Aviation A320 VT-ISE · Serious incident: loss of control
AAIB India report title: Final Investigation Report on Serious Incident involving M/s Inter Globe Aviation Limited Aircraft A320, VT- ISE on 05 Feb 2023
Probable cause · AAIB India
The probable cause of this serious incident could be attributed to the fracture of the HPT 2nd stage Air seal caused due to axial rubbing between the HPT 2nd stage air seal and the TIC inner case. The axial rubbing was caused due to the reduced gap between the HPT 2nd stage air seal and TIC.
What happened
On 5th February 2023, M/s IndiGo's Airbus A320-271N aircraft, registration VT-ISE, while operating a scheduled flight 6E-5926 from Amritsar to Kolkata, had involved in a one engine In- Flight Shut Down (IFSD) occurrence. Flight 6E-5926 was under the command of an ATPL holder Pilot, who was the Pilot Flying (PF). The co-pilot was also an ATPL holder, and the Co-pilot was the Pilot Monitoring (PM). There were 125 passengers and six crew members onboard. The aircraft took off from Amritsar Airport uneventfully. While climbing past 3000 ft, the crew heard a loud bang noise. Subsequently, engine no. 1 fail message was triggered on the ECAM. The crew initiated the ECAM procedures and secured the failed engine no. 1. They decided to return to Amritsar. All parameters for engine no. 2 were normal. The crew informed ATC Amritsar about the engine no. 1 failure and declared PAN, PAN. They obtained the necessary clearances and landed the aircraft safely on a single engine at Amritsar airport. Post arrival, in the initial inspection at Amritsar airport, substantial damage in engine no. 1 was observed by IndiGo’s maintenance personnel and the damaged engine was replaced with a serviceable one. The occurrence was classified as a Serious Incident and the Director General, AAIB order an Investigation to investigate into the probable cause(s) of this Serious Incident, vide Order No. INV.12011/01
Findings
- 3.1.1 The aircraft had a valid Certificate of Airworthiness, Certificate of Registration and the Airworthiness Review Certificate before operating the incident flight.
- 3.1.2 As per aircraft maintenance records, the aircraft was maintained as per applicable maintenance data.
- 3.1.3 The engine examination and analysis revealed that the HPT 2nd Stage Air Seal wire seal (Part No. 50L294) was dislodged from the grooves. This was likely due to the mis-assembly of the wire seal during the last engine shop visit.
- 3.1.4 Flight data analysis revealed that there were no precursors to the event found in the flight data.
- 3.1.5 The flight crew / pilots were appropriately licensed, qualified and medically fit to operate the flight.
- 3.1.6 The Flight crew/pilots’ actions post engine malfunction were in accordance with the Standard Operating Procedures and company’s FCOM procedures.
- 3.1.7 As per prevailing emergency the Pilot executed a commanded IFSD and ATB to T/O airport.
- 3.1.8 The engine examination & engineering analysis had established that the mis-assembled wire seal produces a local axial bulge at the rear of the HPT 2nd stage air seal. Which pushes the HPT 2nd stage air seal towards the TIC i.e., a local axial deflection of HPT air seal OD surface.
- 3.1.9 The axial deflection of the HPT 2nd stage air seal in combination with a greater than predicted gap closure not captured during hardware design led to a clash between the HPT 2nd stage air seal and the TIC Inner Case.
- 3.1.10 The clashing contact between the HPT 2nd stage air seal (mini disk) and Intermediate Turbine case (TIC) inner case as an event that causes the primary damage i.e., the fractured HPT 2nd stage air seal. Other damage such as damage in the HPC, HPT, LPT are consequential. 3.2 Probable Cause and Contributory Factors
Safety recommendations
- 4.1 The OEM is in the process of incorporating hardware changes to eliminate the risk of the wire seal coming out of the groove. Upon completion of this process, the OEM should share the corrective measures taken to prevent the recurrence of a similar incident with the AAIB, India.
- 4.2 It is recommended that P&W should add instructions to use shim stock to check the gaps between the center of each blade root (44 locations) and the air seal to ensure proper wire seal installation. This should be added to the special procedure (SP1100G-B-72-51- 40-00C-710A-B) within the engine manual. Upon completion of this process, the P&W should share a copy of amended Special Procedure…
Source reports
- Final Investigation Report on Serious Incident involving M/s Inter Globe Aviation Limited Aircraft A320, VT- ISE on 05 Feb 2023 (Final report)
Questions
What happened to VT-ISE on 5 February 2023?
On 5th February 2023, M/s IndiGo's Airbus A320-271N aircraft, registration VT-ISE, while operating a scheduled flight 6E-5926 from Amritsar to Kolkata, had involved in a one engine In- Flight Shut Down (IFSD) occurrence. Flight 6E-5926 was under the command of an ATPL holder Pilot, who was the Pilot Flying (PF). The co-pilot was also an ATPL holder, and the Co-pilot was the Pilot Monitoring (PM). There were 125 passengers and six crew members onboard. The aircraft took off from Amritsar Airport uneventfully. While climbing past 3000 ft, the crew heard a loud bang noise. Subsequently, engine no. 1 fail message was triggered on the ECAM. The crew initiated the ECAM procedures and secured the…
What caused the serious incident involving VT-ISE?
According to the AAIB India report: The probable cause of this serious incident could be attributed to the fracture of the HPT 2nd stage Air seal caused due to axial rubbing between the HPT 2nd stage air seal and the TIC inner case. The axial rubbing was caused due to the reduced gap between the HPT 2nd stage air seal and TIC.
Who investigated the serious incident involving VT-ISE?
The Aircraft Accident Investigation Bureau (AAIB), India. Latest report: final report.
What safety recommendations were made after the serious incident involving VT-ISE?
The report makes 2 safety recommendations. 4.1 The OEM is in the process of incorporating hardware changes to eliminate the risk of the wire seal coming out of the groove. Upon completion of this process, the OEM should share the corrective measures taken to prevent the recurrence of a similar… 4.2 It is recommended that P&W should add instructions to use shim stock to check the gaps between the center of each blade root (44 locations) and the air seal to ensure proper wire seal installation. This should be added to the special procedure…
Full case page: events, crew, weather, defence layers and page links
Related cases
- IndiGo Airbus A320 VT-IFM · Serious incident: loss of control
- Go Air Airbus A320 VT-WGC · Serious incident: loss of control at Delhi Airport
- IndiGo Airbus A320 VT-ITU · Serious incident: air turn back due to engine stall
- IndiGo Airbus A320 VT-IVB · Serious incident: air turn back due to engine stall
- IndiGo Airbus A320-271 VT-ITW · Serious incident: air turn back due to engine stall
- IndiGo Airbus A320-271 VT-ITQ · Serious incident: air turn back due to engine stall